YachtByte Official Resource
Pre-arrival information
- Available voltage, frequency, phase arrangement and current limit confirmed.
- Connection type, cable requirement and marina contact confirmed.
- Generator-running restrictions reviewed.
- Expected hotel load on arrival estimated.
- Fallback plan agreed if shore power is unstable.
Load planning
- Chillers, galley, laundry, chargers, watermakers, AV/IT, spa and toy chargers reviewed.
- Non-essential loads reduced before transfer.
- Bridge, galley and interior informed of transfer window.
- Current limit set where applicable.
- Large loads staged after connection.
Physical checks
- Cable jacket, plug, inlet and pedestal inspected.
- Cable rating and routing checked.
- Cable protected from traffic, water traps and strain.
- Converter or transformer status confirmed.
- Protection and earth checks completed according to procedure.
Post-connection monitoring
- Voltage, frequency and current monitored.
- Phase balance checked where applicable.
- Cable, transformer or converter temperature watched.
- PMS, converter and breaker alarms recorded.
- Trip evidence captured before reset.