Drawing set
- Master drawing list reviewed.
- Latest one-line diagram identified.
- Main and emergency switchboard drawings current.
- Shore-power, UPS, battery and charger drawings current.
- Cable schedules and routing drawings available where needed.
Load schedule
- Recent AV/IT, galley, laundry, HVAC, charger, toy or tender additions checked.
- Emergency, essential and UPS-backed loads identified.
- Shore-power current limits and converter changes reflected.
- Battery and UPS loads included.
- Unknown loads assigned to an owner for follow-up.
Version control
- Every drawing shows revision, date, issuer and approval status.
- Temporary redlines are assigned for closeout.
- Obsolete drawings removed from working folders.
- Digital and onboard copies match.
- Management company has current digital set.
Handover evidence
- Open redlines listed.
- Responsible party assigned for final drawings.
- Class or survey status recorded where applicable.
- Review date and reviewer recorded.
- Defects or documentation gaps entered into the defect log.